Shower remodel
Full tear-out to tile: waterproof shower pan, cement board, built-in niche and large-format tile.
From a new shower or deck to stair railings, walls, floors and paint, Formo US handles the full job and shows you the results below.
One crew for the whole list, so you don't have to hire a different contractor for each part of the job.
Showers, tile, waterproofing, fixtures
Decks, pavilions, railings, stairs
Repair, rebuild and new installs
Framing, drywall, closets, doorways
Install and repair
Interior, exterior, doors and trim
Custom storage made to fit your space
Steel frames, beams and metal structures
Small jobs and punch lists
Browse by project. Tap any photo to enlarge it.
Full tear-out to tile: waterproof shower pan, cement board, built-in niche and large-format tile.
Prep, prime and repaint of exterior French doors.
Sanded and refinished a carved wood entry door.
Old paint sanded off a door down to bare wood.
Timber-frame pavilion with metal roof built beside the pool.
Ground-level deck framed on posts and beams.
Raised deck with railing and stairs.
Old wood balusters replaced with iron balusters on the staircase and upstairs landing.
New wood stairs with cable railing and LED lighting along the handrail.
Framed and enclosed the open space under a raised deck, with a hinged door for storage.
Built in the shop, installed and painted on site.
Custom shelves above the washer and new trim and paint around the closet doors.
New wall and doorway framed and drywalled.
Siding removed, wall reframed and wrapped around a new window.
Tall partition walls framed and covered for a paint studio.
Wall framed around a fireplace insert, then covered with cement board and large-format tile.
Wall framed and insulated, then drywalled, trimmed and painted.
Rough-cut plank wall installed over foam insulation.
Opening in a mailroom wall closed up and finished.
Rotted sill and trim under a large window cut out and replaced with new wood.
Steel beams welded in place on a metal roof, with the finished metal wall structure.
Decorative beam recess with new fixtures.
Replacing hallway light fixtures.
Underlayment and glueless laminate installed through the rooms.
Cabinets installed and finished.
Navy cabinets and sink wall in a basement.
New stone mailbox column with house numbers.
Cinder block mailbox rebuilt as a new concrete column.
Fill out the form, or call, text or email us with photos of the space and what you'd like done. We'll follow up to schedule a visit.